Update: September 26, 2017
Countryside Drive - Traffic Detour
Countryside Drive will be closed at the intersection of Williams Trace Boulevard until October 18 . Traffic will be detoured to Planters Drive and Greenfields Drive. The detour is taking place to allow for storm sewer, utility, and paving installation.
Residents are asked to be mindful of work crews, expect traffic delays, and when possible, avoid the area to prevent traffic congestion. Visit its.sugarlandtx.gov for more information on Sugar Land travel time data.
------------------------------------------
Initial Communication
Phase I of the Williams Trace Reconstruction project is scheduled to begin on January 2017. The overall scope of the project is as follows:
- Full replacement of the roadway, from SH 6 through Austin Parkway
- Full replacement of the existing water main (due to age and material type)
- Upgrade of the existing traffic signals at Austin Parkway
- Construction of an additional parallel storm sewer along the project corridor to correct drainage deficiencies
- Construction of a 10-ft sidepath along Williams Trace from Austin Parkway to SH6
Updates will be posted on this website in addition to advance notices given for temporary water service outages and road closures.
Project documentation is available below:
Project: Williams Trace Reconstruction Phase I, CIP # ST1408
Project Manager: Ross Woodfin
Engineering Department: (281) 275-2780