PROPOSITION C PROJECT SH 6 at Brooks St Drainage Modifications $5.825M
SH 6 at Brooks Street experiences localized street ponding exceeding the City's drainage criteria during rain events. In 2022, a drainage study was conducted to analyze the existing drainage system and recommend modifications.
SH 6 at Brooks St
2024 Bond Project
Enlarge storm sewer main line along Garden Ln, Hillstone and Whetrock Ln in Chimneystone.
Funding: 2024 GO Bond - $5,825,000 Project Manager: Sagnik Raha CIP #: CDR2601