2024 Bond Project
Conduct drainage studies, analysis and advance modeling to aid the City in identifying future drainage projects and to conduct localized drainage modifications at various locations.
Funding: 2024 GO Bond - $550,000
Project Manager: Alence Poudel
CIP #: CDR3001