2024 Bond Project
Replace drainage system from Ditch C-1 in Fort Bend LID 2 to East of Mesquite Dr. The project is connected to the Chimneystone drainage channel and it aims to reduce the depth and duration of ponding in the area during rainfall events.
Funding: 2024 GO Bond - $8,175,000
Project Manager: Alence Poudel
CIP #: CDR2701