Bond Propositions

Proposition A – Drainage Projects

10 Projects | 47.6 Million

Project Name
Bond Phase
Cost ($)
Sugar Creek Drainage Improvements - Montclair Dr. 
   Project HistoryProject Summary 
C
8.8M
Riverbend Stormwater Inlets and Pipe Replacement
   Project HistoryProject Summary
D/C
3.5M
Flood Control Improvements - Dam III Oyster Creek @ Lexington
   Project HistoryProject Summary
C
0.8M
Austin Park/Chimneystone Drainage Improvements
   Project HistoryProject Summary
D/C
16.5M
Greatwood Village Drainage Improvements 
   Project HistoryProject Summary 
S/D/C
3M
Avalon/Brazos Landing/Commonwealth Drainage Improvements
Phase I - Lake Control Structure Modification
   Project HistoryProject Summary
D/C
1.1M
Avalon/Brazos Landing/Commonwealth Drainage Improvements
Phase II - Elkins Road
   Project HistoryProject Summary
D/C
7.3M
Telfair Drainage Improvements - New Territory Blvd & Chatham
   Project HistoryProject Summary
D/C
3M
Covington Drainage Improvements – Covington West & Imperial Woods
   Project HistoryProject Summary
D/C
3M
Citywide Flood Prevention & Drainage Studies
   Project HistoryProject Summary
S/D/C
0.6M
Total Drainage Projects
 
47.6M
(S) Study  (D) Design  (C) Construction    

Proposition B - Public Safety/Public Facility Projects

4 projects | 26.3 Million

Project Name
Bond Phase
Cost ($)
Emergency Operations Center/Public Safety Dispatch Building
   Project HistoryProject Summary
D/C
11.5M
Public Safety Training Facility – Phase II
   Project HistoryProject Summary
D/C
10M
Public Safety & Public Services Building Rehabilitation
   Project HistoryProject Summary
C
3M
Fire/EMS Apparatus Replacement
   Project HistoryProject Summary
E
1.8M
Total Facilities Projects
 
26.3M
(S) Study (D) Design (C) Construction  (E) Equipment Purchase    

Proposition C - Streets Projects

5 Projects | 10.26 Million

Project Name Bond Phase Cost ($)
Country Club Blvd Improvements - Sugar Creek to Chesterfield
   Project HistoryProject Summary
C
1.7M
University Blvd Widening – FBC Mobility Bond Project
D/C
1.7M
Soldiers Field Extension to SH 6 / Roundabout at First Colony Blvd and Soldiers Field
C
2.46M
Major Streets Rehabilitation
   Project HistoryProject Summary
C
4M
Citywide Transportation & Mobility Studies
   Project HistoryProject Summary
S/D/C
0.4M
Total Streets Projects
 
10.26M
(S) Study (D) Design (C) Construction    

Proposition D - Animal Shelter

1 Project | 6.6 Million

Project Name
Bond Phase
Cost ($)
Animal Shelter
   Project HistoryProject Summary
D/C
6.6M
Total Animal Shelter Project
 
6.6M
(S) Study (D) Design (C) Construction