On October 7, 2003, the Sugar Land City approved a General Plan for Telfair as a first step in development of this master planned community. Since that time there have been four amendments to the Telfair General Plan with the most recent occurring in November 2009. The plan consists of 2,018 acres in the City of Sugar Land. The property is located south of US HWY 90A, west of State HWY 6, and east of New Territory Subdivision. Tract 4 is located on the north side of US HWY 59, while Tract 5 is located next to the University of Houston (U of H) Sugar Land Campus on the south side of US HWY 59. Historically, the property has had agricultural operations relating to the Texas Department of Corrections prison farm system in the immediate area. The property is under development and is predominantly single family, with a mix of multi-family, commercial, research & development, public/private parks, recreation, and open space areas.
Sign up for Telfair General Plan e-mail updates
The University of Houston site is located immediately to the west of Tract 5, and the potential for mutually beneficial development has been identified in the City’s Target Industry Study.
The “Land Use Plan” exhibit indicates the land uses and layouts for the project. The following table illustrates land uses within the Tracts 4 & 5 project by acres and percentages.
Land Uses: |
Approximate Acres: |
Additional Notes: |
Residential Single Family(R-1) & (R-1Z) |
875.0 |
|
Planned Development (PD) Tract 4- (residential mixed use) “TN1 thru TN6” |
58.0 |
Requires future approval of a Final Development Plan |
Commercial/Office (B-O/ B-2/ Future PD) |
248.1 |
Includes 112 acres known as Crossing at Telfair (90A and SH6) |
Mixed Use Tract 4 “MU 2, MU 3, & MU 4” |
71.3 |
|
Mixed Use Tract 5 “MU1” |
95.0 |
Office/Services/R&D |
Elementary & High Schools |
89.1 |
|
Civic/Community Area Central State Prison Farm Building Complex |
16.5 |
Within Tract 4 PD Boundary Line |
OPEN SPACE AREAS- Neighborhood Parks, Rec., Landscape Easements, Cemetery, Drainage, Lakes, Bayous, Levees |
Shown As 433.6
|
*72 acres of Regional Park *12 acres of AZO2 *2.5 acres of Cemetery |
Utility Easements and Drill Sites |
34.0 |
|
Circulation (Arterials/Collectors) |
96.2 |
|
Total Acreage: (approx.) |
2018.0 |
Acreage breakdowns based on Land Use Plan – Amendment 4
The largest land use category out of the 2018 acres is Residential Single Family at 41% using the R-1/ R-1Z standards. Approximately 30% is mixed commercial. Areas of green-space / greenbelts, which would include parks, recreation centers, and landscape easements, total approximately 21% of the overall acreage. Multi-family sites are 1% of the 2,018 acres and included as part of an overall PD concept. Tract 5 indicates a potential research and development area. Two 12 acre elementary school sites and one 65 acre high school site are included within the plan. Fire Station 7 site, purchased by the City at the Northeast corner of Chatham Avenue and New Territory Boulevard, is being developed in 2010.
The General Plan land use layout combined with the major street pattern represents good planning principles as to overall buffering between intensities of uses, as well as circulation to and from neighborhoods and commercial areas. Buffering with landscaped areas, ponds, and open spaces provide separation, and the siting of most of the commercial adjacent to major roadways, easements, and ponds limits impact on residential areas. The Plan has a 50’ landscape buffer will be placed along the property adjacent to the US HWY 59 frontage road. Noise mitigation barriers will be placed along this area as of May 2010. Noise mitigation barrier provisions are required through Chapter 5 (Subdivision Regulations) of the Development Code and are reviewed during the platting process.
Development Phasing -
Building construction within the proposed development began mid 2005. As of May 1, 2010 there are 2, 109 recorded single family lots in Tract 4. Additional residential lots are anticipated in late 2010 for both Tract 4 and Tract 5. The following residential sections have been platted and recorded as of 2010:
Sections 1-9; Sections 11-14; Sections 15A, 15B, 16-23; Sections 28, 29A and 30. Section 10, adjacent to the northeast intersection of New Territory Blvd. and Chatham Avenue, is pending plat recordation soon for a total of 92 single family lots.
Major Roadway Plan -
The City of Sugar Land Major Roadway Plan (Ordinance No. 1386) indicates the major arterial of University Boulevard, the extension of New Territory Boulevard going east, and the extension of a street from First Colony to the west for Tract 4. The Major Roadway Plan indicates a continuation of Lexington Boulevard across Tract 5 and connecting to University Boulevard. The Telfair General Plan contains the elements shown within the Major Roadway Plan.
Traffic Impact Analysis -
The applicant submitted a revised detailed Traffic Impact Analysis (TIA) prepared by Brown and Gay Engineers, Inc. that indicates traffic levels and proposed improvements recommended for Tracts 4 and 5. The TIA illustrates when specific segments of the future roads within the proposed development are to be completed as well as when improvements adjacent to the proposed development will be constructed. The TIA is referenced in the Development Agreement. In 2009, University Blvd., through Telfair's Tract 4, was opened from State Highway 6 to US 59.
Water, Wastewater, Drainage, and Flood Protection -
Telfair is served by Fort Bend County Municipal Utility Districts 136, 137, 138, and 139 (in-City MUD's). The Municipal Utility Districts provide the water and wastewater utilities and treatment, working with the City of Sugar Land Public Works Department through a utility agreement.
The Tracts 4 & 5 project are protected from flooding through Fort Bend County Levee Improvement District (LID) No. 17, which the City of Sugar Land City Council gave consent to. Detention and levee infrastructure are financed and controlled by LID No. 17. The storm sewer collection system is designed and financed by the Municipal Utility Districts.
Parkland and Open Space -
The Telfair General Plan is in conformance with the Parks, Recreation, and Open Space Master Plan. The projections in 2010 for parkland dedication are approximately 35 acres, half of which is proposed as private park facilities. The Parks Department has indicated that the public parkland requirement can be satisfied in a regional park. The City can purchase any additional acreage needed to satisfy regional park standards. Additional details of parks and open space will be worked through future preliminary and final plats.
Economic Development -
The City Council adopted the Economic Development Plan in September of 2001. It states the City’s intention to “promote a consistent, quality economy that enhances the standard of living for our residents and to provide the necessary resources for the City of Sugar Land through an expanded and diversified tax base”. City Council directed that this General Plan involve the City’s preference to maintain a certain amount of land available for economic development purposes and an intention to annex the tracts.
In May, 2001, the City adopted Resolution No. 01-24, which provides for a reimbursement of 100% of City taxes, minus the cost of providing required services, if the developer of Tracts 4 and 5 shows a land use mix of not less that 30% nonresidential use. While the resolution does not actually restrict the nonresidential component, it does relay the City’s preferred mix of uses. When comparing just the nonresidential to residential mix, the submitted General Land Plan shows approximately 31% nonresidential and 69% residential. The intent of the Resolution was to set aside land for economically strong uses, or basic industries.
Development Agreement -
As previously referenced, a Development Agreement between the developers of Telfair and the City of Sugar Land was signed at the same time as the adoption of the General Plan in 2003. The Development Agreement relates primarily to infrastructure and utility issues and links the development to the latest approved General Plan, which is currently the November 2009 plan.
Land Use Plan Exhibit: (click here for pdf)